Monday, 02 December 2024

EQUIPMENT

Successful completion of power and automation electrical panels construction project, by C&A Stavros Kassidiaris S.A., for ELTRAK S.A.

Successful completion of power and automation electrical panels construction project, by C&A Stavros Kassidiaris S.A., for ELTRAK S.A.

C&A Stavros Kassidiaris S.A., in collaboration with ELTRAK S.A., has successfully completed another project for the construction of power and automation electrical panels.


The project took place on a Container-type ship in China, with the goal to upgrade the capabilities of the existing generators, thereby enabling the transport of larger cargo.
The study, design, and execution of the project were carried out with utmost precision and efficiency. All necessary checks were conducted to ensure the safe connection of the electrical panels to the ship, fully addressing the additional requirements for transporting the increased cargo.
The inspections covered both the technical aspects and safety measures for the workers involved in the project, ensuring the reliability and efficient operation of the system.

1

World Shipping news for the marine professional. Read maritime news online.

NEWSLETTER

Subscribe to our newsletter. Don’t miss any news or stories.